Electrical Work for Afghanistan National Police (ANP)

City power connection to CTC/PD9 facilities in Kabul with capacity of 2000 kVA. Provision, manufacturing and installation of 20/15 kV MV Panels, 3200 A ATS, Main Distribution Panels, 600 kvar Capacitor Bank, 2000 kVA Transformer and MV overhead lines.

Design and implementation of electrical power system for ANP training facility in Herat – Installation of 2 MVA generator along with ATS.

Design and implementation of electrical power station of Camp Gibson in Kabul – installation of 2×1250 kVA generator sets.

Client: DynCorp International LLC

Location Kabul and Herat Cities, Afghanistan

Date: Mar. 2008 to Jul. 2010