Aino Mena Township Power Distribution

Novin Simia was the prime contractor to design and implement the power distribution network in Aino Mena Township in Kandahar for 23,000 (twenty-three thousand) housing units in approximately 20,000 (twenty thousand) hectares area of construction. Major items in the scope of this project were to implement 70 km medium voltage overhead line distribution, 32 km Medium Voltage Underground, 160 km low voltage ABC cable distribution system and installation of 230 pole mounted transformers. Novin Simia deployed its professional and experienced cadre of personnel including engineers, technicians and skilled labor to proceed with the implementation of this project in rapid pace.

  • 230 Sets Pole-Mounted Transformers
  • 150 km Low Voltage ABC Cable
  • 70 km Medium Voltage Overhead Line
  • Installation of 5000 Concrete Power Poles
  • 85 Set Compact Transformer Station
  • 32 km Medium Voltage Underground

Location: Aino Mena, Kandahar, Kandahar Province, Afghanistan

Date: Jun. 2012 to Dec. 2014