History of Novin Simia

Novin Simia’s remarkable journey began in 2008 with its first production facility in Herat, Afghanistan. We’ve since expanded, fueled by strategic investments and collaborations. Key milestones include:

  • 2008: Established first production facility in Herat

  • 2010: Opened second production facility in Kabul

  • 2016: Commenced substation projects

  • 2017: Established test, commissioning and in-house design teams

  • 2019: Inaugurated third and fourth facilities in Kabul

  • 2024: Initiated 500 kV Substation Project (Full EPC)

Today, Novin Simia is a premier EPC contractor and trusted manufacturer in Afghanistan, committed to excellence, innovation, and customer satisfaction.

2004
Start Working in Electrical

Start Working in Electrical

Start working in electrical industry of Afghanistan Working on Robat Sangi substation project (2005 to 2008)

2008
Register Novin Simia

Register Novin Simia

Register Novin Simia and steblish manufacturing Facilities

2010
Electrical Works for CTC/PD9

Electrical Works for CTC/PD9

Electrical Works for CTC/PD9, Kabul Sub-Contractor to DynCorp

2012
Electrical Works for Shindand

Electrical Works for Shindand

Novin Simia was actively involved in rehabilitation of Electrical System in Shindand Airbase.

2014
Power Distribution Network

Power Distribution Network

Power Distribution Network in Aino Mina Township, Kandahar for 23000 housing units

2016
Novin Simia manufactured

Novin Simia manufactured

Novin Simia manufactured 2280 Lno. of LV distribution panels and 4500 no. metering boxes for Distribution Plant for Kabul South West funded by Asian Development Bank.

2018
Novin Simia Successfully completed

Novin Simia Successfully completed

Novin Simia Successfully completed works in mjor substations Maiwand and Pushmul substations in SEPS and Pul-e Alam Substations in NEPS

2019
substations in Herat, Kabul, Balkh provinces

substations in Herat, Kabul, Balkh provinces

Novin Simia will complete major substations in Herat, Kabul, Balkh provinces.

2020
Spun Concrete poles

Spun Concrete poles

Novin Simia has established a modern spun concrete pole manufacturing facility at Sanaya Sabz Industrial Parks, located in the Deh Sabz district of Kabul.

2021
ANA AEI Electrical Interconnect Construction Project

ANA AEI Electrical Interconnect Construction Project

Design, construction, supply, installation, testing and commissioning of 39.09 km 20 kV Power Distribution Line (27.81 km Double Circuit & 11.28 km Single Circuit).

2025
Dasht-e-Alwan Substation

Dasht-e-Alwan Substation

500/220/20 kV substation with incoming line bay, 2x100 MVAR shunt reactor bays.Client: Da Afghanistan Breshna Sherkat (DABS)

2025
Kandahar Breshnakot Substation

Kandahar Breshnakot Substation

110/20 kV line bay extension with transfer bay and outgoing feeders. Client: Da Afghanistan Breshna Sherkat (DABS)

2026
Kunduz Transmission Line

Kunduz Transmission Line

Extension of a new 220 kV Transmission Line with a length of 44.5 Km from Asqalan Substation to a new Substation in Dasht-e-Archi District of Kunduz Province, including Survey, Design, Procurement of Equipment, Installation, Testing and Commissioning.

2026
3 Substations in Qarabagh, Moqor & Shahjoy

3 Substations in Qarabagh, Moqor & Shahjoy

Completion of Design, Supply, Installation, Construction and Testing and Commissioning of Qarabagh, Moqor and Shah Joy 220 KV/20KV Substations (One Lot)

2026
4 Substations in Herat

4 Substations in Herat

Construction, Erection, Testing and Commissioning of 4 Nos Of 110/20 kV Substations Each at Karokh, Chesht, Hobai, Pashtoon-Zarghoon Project