Novin Simia Company

26

Jan

Comments Off on ANA Afghanistan Electrical Interconnect (AEI) at the Central Supply Depot (CSD) Base Connections

Design-Build Subcontracts

20 kV OHL Distribution System

Design, construction, supply, installation, testing and commissioning of 40 MVA Transfer Bay.

Client:
Da Afghanistan Breshna Sherkat (DABS)

Prime Contractor:
Assist Consultants Inc. (ACI)

Novin Simia’s Role:
Subcontractor (Full EPC)