Novin Simia Company

26

Jan

Comments Off on ANA AEI Electrical Interconnect Construction Project at Camp Commando- Rishkhor & MFNDU

Design-Build Subcontract

20kV OHL Distribution system

Design, construction, supply, installation, testing and commissioning of 39.09 km 20 kV Power Distribution Line (27.81 km Double Circuit & 11.28 km Single Circuit).


Client:
Da Afghanistan Breshna Sherkat (DABS)


Prime Contractor:
Assist Consultants Inc. (ACI)


Novin Simia’s Role:
Subcontractor (Full EPC)