NEPS Electrical Transmission Projects – Phase I, 220/20 kV Substation at Pule Alam, Logar Province, Afghanistan
- Voltage Rate 220 kV to 20 kV
- 4× 16 MVA, 50 Hz, Power Transformers
- Double Main Bus & Transfer Bus System
- 2 Incoming/Outgoing 220 kV and 4 Outgoing 20 kV Feeders
Client: US Army Corps of Engineers (USACE)
Prime Contractor: Assist Consultants Inc.
Date: Jun. 2016 to Oct. 2017 (scheduled)
Location: Pul-e Alam, Logar Province, Afghanistan
Pul-e-Alam substation does have two 220 kV line bays, four 220/20 kV transformers rated 16 MVA each, 20 kV yard with indoor switchgear. This substation plays a strategic role for power distribution in the Province. Four outgoing 20 kV feeders will energize important areas/facilities within the Province including Pul-e Alam City, Kabul-Logar Highway, major towns, and numerous villages where power needed for agricultural purposes.
Novin Simia is responsible for provision of installation, testing and commissioning services the Pul-e-Alam substation in Logar Province.